Line 2A
Western suburban corridor.
Dahisar East ⇄To
Andheri West
Pan, zoom, click a colored line or select a station · Map data © OpenStreetMap contributors
Explore other lines
About Line 2A
Frequently asked questions
Which stations are on Line 2A in Mumbai Metro?
4 stations from Dahisar East to Andheri West: Dahisar East, Borivali West, Kandivali West, Andheri West.
What are the first and last train timings for Line 2A?
First train 05:30 — last train 23:00. No scheduled overnight service. Timings can vary by station and direction; confirm with Mumbai Metro Rail Corporation.
How long does Line 2A take end to end?
About 28–32 min over 14.6 km. Peak frequency 6–8 min, off-peak 8–12 min.
Where can I interchange from Line 2A to other lines?
This line has no same-city interchange within the mapped network. Check the full network page for connections via shared stations.
Who operates Line 2A?
Mumbai Metro Rail Corporation (MMRC / MMRDA). Rolling stock: Alstom Metropolis · 4-car. Design speed: 80 km/h. Opened: April 2, 2022.
Source: Mumbai Metro Rail Corporation, OpenStreetMap, Official publications · Last updated: Aug 2026