OPERATIONAL · MUMBAI METRO

Line 2A

Western suburban corridor.

From
Dahisar East
⇄To
Andheri West
▭14.6 kmLength
◉4Stations
◷28–32 minTravel time
▦05:30 – 23:00Service hours
◎ Overview◉ Stations⬡ Connections◷ Timings↗ Updates
MapSatellite
⛶ Full screen
Normal map · OpenStreetMap 1 metro lines · 1 networks · Updated Aug 2026
Loading OpenStreetMap…
Metro Station

Pan, zoom, click a colored line or select a station · Map data © OpenStreetMap contributors

Line 2A (Line 2A) Station
Stations (4)View all stops
01Dahisar EastOrigin
02Borivali West
03Kandivali West
04Andheri WestTerminus

Explore other lines

About Line 2A

▦OpenedApril 2, 2022
◉OperatorMMRC / MMRDAMumbai Metro Rail Corporation
▭Rolling stockAlstom Metropolis · 4-carStandard trains
◷Design speed80 km/h

Frequently asked questions

Which stations are on Line 2A in Mumbai Metro?

4 stations from Dahisar East to Andheri West: Dahisar East, Borivali West, Kandivali West, Andheri West.

What are the first and last train timings for Line 2A?

First train 05:30 — last train 23:00. No scheduled overnight service. Timings can vary by station and direction; confirm with Mumbai Metro Rail Corporation.

How long does Line 2A take end to end?

About 28–32 min over 14.6 km. Peak frequency 6–8 min, off-peak 8–12 min.

Where can I interchange from Line 2A to other lines?

This line has no same-city interchange within the mapped network. Check the full network page for connections via shared stations.

Who operates Line 2A?

Mumbai Metro Rail Corporation (MMRC / MMRDA). Rolling stock: Alstom Metropolis · 4-car. Design speed: 80 km/h. Opened: April 2, 2022.

Source: Mumbai Metro Rail Corporation, OpenStreetMap, Official publications · Last updated: Aug 2026