OPERATIONAL · MUMBAI METRO

Line 7

North–south western suburbs corridor.

From
Dahisar East
⇄To
Aarey
▭15.4 kmLength
◉14Stations
◷30–34 minTravel time
▦05:30 – 23:00Service hours
◎ Overview◉ Stations⬡ Connections◷ Timings↗ Updates
MapSatellite
⛶ Full screen
Normal map · OpenStreetMap 1 metro lines · 1 networks · Updated Aug 2026
Loading OpenStreetMap…
Metro Station

Pan, zoom, click a colored line or select a station · Map data © OpenStreetMap contributors

Line 7 (Line 7) Station
Stations (14)View all stops
01GundavaliOrigin
02Mogra
03Jogeshwari (East)
04Goregaon (East)
05Aarey
06Dindoshi
07Kurar
08Akurli
09Mahindra & Mahindra
10Magathane
11Devipada
12Rashtriya Udyan
13Ovaripada
14Dahisar (East) [Line 7]Terminus

Connecting lines & interchanges

GundavaliInterchange
7 (
Line 7 (Dahisar (East) → Gundavali)›
MograInterchange
7 (
Line 7 (Dahisar (East) → Gundavali)›
Jogeshwari (East)Interchange
7 (
Line 7 (Dahisar (East) → Gundavali)›
Goregaon (East)Interchange
2 (2 (7 (
Line 2 (Andheri West → Dahisar (East)), Line 2 (Dahisar (East) → Andheri West), Line 7 (Dahisar (East) → Gundavali)›

Explore other lines

About Line 7

▦OpenedApril 2, 2022
◉OperatorMMRC / MMRDAMumbai Metro Rail Corporation
▭Rolling stockAlstom Metropolis · 4-carStandard trains
◷Design speed80 km/h

Frequently asked questions

Which stations are on Line 7 in Mumbai Metro?

14 stations from Dahisar East to Aarey: Gundavali, Mogra, Jogeshwari (East), Goregaon (East), Aarey, Dindoshi, Kurar, Akurli, Mahindra & Mahindra, Magathane, Devipada, Rashtriya Udyan, Ovaripada, Dahisar (East) [Line 7].

What are the first and last train timings for Line 7?

First train 05:30 — last train 23:00. No scheduled overnight service. Timings can vary by station and direction; confirm with Mumbai Metro Rail Corporation.

How long does Line 7 take end to end?

About 30–34 min over 15.4 km. Peak frequency 6–8 min, off-peak 8–12 min.

Where can I interchange from Line 7 to other lines?

Gundavali (Line 7 (Dahisar (East) → Gundavali)); Mogra (Line 7 (Dahisar (East) → Gundavali)); Jogeshwari (East) (Line 7 (Dahisar (East) → Gundavali)); Goregaon (East) (Line 2 (Andheri West → Dahisar (East)), Line 2 (Dahisar (East) → Andheri West), Line 7 (Dahisar (East) → Gundavali))

Who operates Line 7?

Mumbai Metro Rail Corporation (MMRC / MMRDA). Rolling stock: Alstom Metropolis · 4-car. Design speed: 80 km/h. Opened: April 2, 2022.

Source: Mumbai Metro Rail Corporation, OpenStreetMap, Official publications · Last updated: Aug 2026