OPERATIONAL · MUMBAI METRO

Line 1

East–west corridor across Mumbai’s western suburbs and airport-side interchange.

From
Versova
⇄To
Ghatkopar
▭10.6 kmLength
◉12Stations
◷20–24 minTravel time
▦05:30 – 23:00Service hours
◎ Overview◉ Stations⬡ Connections◷ Timings↗ Updates
MapSatellite
⛶ Full screen
Normal map · OpenStreetMap 1 metro lines · 1 networks · Updated Aug 2026
Loading OpenStreetMap…
Metro Station

Pan, zoom, click a colored line or select a station · Map data © OpenStreetMap contributors

Line 1 (Line 1) Station
Stations (12)View all stops
01VersovaOrigin
02D. N. Nagar
03Azad Nagar
04Andheri
05Western Express Highway (eastbound)
06Chakala - J.B. Nagar
07Airport Road
08Marol Naka (Line 1)
09Saki Naka
10Asalpha
11Jagruti Nagar
12GhatkoparTerminus

Connecting lines & interchanges

AndheriInterchange
2 (2 (
Line 2 (Andheri West → Dahisar (East)), Line 2 (Dahisar (East) → Andheri West)›
Marol Naka (Line 1)Interchange
3
Line 3›

Explore other lines

About Line 1

▦OpenedJune 8, 2014
◉OperatorMMRC / MMRDAMumbai Metro Rail Corporation
▭Rolling stockAlstom Metropolis · 4-carStandard trains
◷Design speed80 km/h

Frequently asked questions

Which stations are on Line 1 in Mumbai Metro?

12 stations from Versova to Ghatkopar: Versova, D. N. Nagar, Azad Nagar, Andheri, Western Express Highway (eastbound), Chakala - J.B. Nagar, Airport Road, Marol Naka (Line 1), Saki Naka, Asalpha, Jagruti Nagar, Ghatkopar.

What are the first and last train timings for Line 1?

First train 05:30 — last train 23:00. No scheduled overnight service. Timings can vary by station and direction; confirm with Mumbai Metro Rail Corporation.

How long does Line 1 take end to end?

About 20–24 min over 10.6 km. Peak frequency 3–5 min, off-peak 6–10 min.

Where can I interchange from Line 1 to other lines?

Andheri (Line 2 (Andheri West → Dahisar (East)), Line 2 (Dahisar (East) → Andheri West)); Marol Naka (Line 1) (Line 3)

Who operates Line 1?

Mumbai Metro Rail Corporation (MMRC / MMRDA). Rolling stock: Alstom Metropolis · 4-car. Design speed: 80 km/h. Opened: June 8, 2014.

Source: Mumbai Metro Rail Corporation, OpenStreetMap, Official publications · Last updated: Aug 2026