OPERATIONAL · BENGALURU METRO

Yellow Line

South Bengaluru corridor.

From
RV Road
⇄To
Bommasandra
▭17.7 kmLength
◉16Stations
◷34–38 minTravel time
▦05:30 – 22:30Service hours
◎ Overview◉ Stations⬡ Connections◷ Timings↗ Updates
MapSatellite
⛶ Full screen
Normal map · OpenStreetMap 1 metro lines · 1 networks · Updated Aug 2026
Loading OpenStreetMap…
Metro Station

Pan, zoom, click a colored line or select a station · Map data © OpenStreetMap contributors

Yellow Line (Yellow Line) Station
Stations (16)View all stops
01Rashtreeya Vidyalaya RoadOrigin
02Ragigudda
03Jayadeva Hospital
04BTM Layout
05Central Silk Board
06Bommanahalli
07Hongasandra
08Kudlu Gate
09Singasandra
10Hosa Road
11Beratena Agrahara
12Electronic City
13Infosys Foundation Konappana Agrahara
14Huskur Road
15Biocon Hebbagodi
16Delta Electronics BommasandraTerminus

Connecting lines & interchanges

Rashtreeya Vidyalaya RoadInterchange
Gre
Green Line›
Central Silk BoardInterchange
Blu
Blue Line›

Explore other lines

About Yellow Line

▦OpenedPhased opening
◉OperatorBMRCLBangalore Metro Rail Corporation
▭Rolling stockBEML · 6-carStandard trains
◷Design speed80 km/h

Frequently asked questions

Which stations are on Yellow Line in Bengaluru Metro?

16 stations from RV Road to Bommasandra: Rashtreeya Vidyalaya Road, Ragigudda, Jayadeva Hospital, BTM Layout, Central Silk Board, Bommanahalli, Hongasandra, Kudlu Gate, Singasandra, Hosa Road, Beratena Agrahara, Electronic City, Infosys Foundation Konappana Agrahara, Huskur Road, Biocon Hebbagodi, Delta Electronics Bommasandra.

What are the first and last train timings for Yellow Line?

First train 05:30 — last train 22:30. No scheduled overnight service. Timings can vary by station and direction; confirm with Bangalore Metro Rail Corporation.

How long does Yellow Line take end to end?

About 34–38 min over 17.7 km. Peak frequency 7–10 min, off-peak 10–15 min.

Where can I interchange from Yellow Line to other lines?

Rashtreeya Vidyalaya Road (Green Line); Central Silk Board (Blue Line)

Who operates Yellow Line?

Bangalore Metro Rail Corporation (BMRCL). Rolling stock: BEML · 6-car. Design speed: 80 km/h.

Source: Bangalore Metro Rail Corporation, OpenStreetMap, Official publications · Last updated: Aug 2026