OPERATIONAL · BENGALURU METRO

Green Line

North–south operational corridor.

From
Nagasandra
⇄To
Silk Institute
▭31.7 kmLength
◉32Stations
◷63–67 minTravel time
▦05:00 – 23:00Service hours
◎ Overview◉ Stations⬡ Connections◷ Timings↗ Updates
MapSatellite
⛶ Full screen
Normal map · OpenStreetMap 1 metro lines · 1 networks · Updated Aug 2026
Loading OpenStreetMap…
Metro Station

Pan, zoom, click a colored line or select a station · Map data © OpenStreetMap contributors

Green Line (Green Line) Station
Stations (32)View all stops
01Silk InstituteOrigin
02Thalaghattapura
03Vajarahalli
04Doddakallasandra
05Konanakunte Cross
06Yelachenahalli
07Jaya Prakash Nagar
08Banashankari
09Rashtreeya Vidyalaya Road
10Jayanagar
11South End Circle
12Lalbagh
13National College
14Krishna Rajendra Market
15Chickpete
16Nadaprabhu Kempegowda Station, Majestic (Green Line)
17Mantri Square Sampige Road
18Srirampura
19Mahakavi Kuvempu Road
20Rajajinagar
21Mahalakshmi
22Sandal Soap Factory
23Yeshwantpur
24Goraguntepalya
25Peenya
26Peenya Industry
27Jalahalli
28Dasarahalli
29Nagasandra
30Manjunathanagara
31Chikkabidarakallu
32MadavaraTerminus

Connecting lines & interchanges

Rashtreeya Vidyalaya RoadInterchange
Yel
Yellow Line›
Nadaprabhu Kempegowda Station, Majestic (Green Line)Interchange
PurPur
Purple Line (Whitefield (Kadugodi) → Challaghatta), Purple Line›

Explore other lines

About Green Line

▦OpenedPhased opening
◉OperatorBMRCLBangalore Metro Rail Corporation
▭Rolling stockBEML · 6-carStandard trains
◷Design speed80 km/h

Frequently asked questions

Which stations are on Green Line in Bengaluru Metro?

32 stations from Nagasandra to Silk Institute: Silk Institute, Thalaghattapura, Vajarahalli, Doddakallasandra, Konanakunte Cross, Yelachenahalli, Jaya Prakash Nagar, Banashankari, Rashtreeya Vidyalaya Road, Jayanagar, South End Circle, Lalbagh, National College, Krishna Rajendra Market, Chickpete, Nadaprabhu Kempegowda Station, Majestic (Green Line), Mantri Square Sampige Road, Srirampura, Mahakavi Kuvempu Road, Rajajinagar, Mahalakshmi, Sandal Soap Factory, Yeshwantpur, Goraguntepalya, Peenya, Peenya Industry, Jalahalli, Dasarahalli, Nagasandra, Manjunathanagara, Chikkabidarakallu, Madavara.

What are the first and last train timings for Green Line?

First train 05:00 — last train 23:00. No scheduled overnight service. Timings can vary by station and direction; confirm with Bangalore Metro Rail Corporation.

How long does Green Line take end to end?

About 63–67 min over 31.7 km. Peak frequency 4–6 min, off-peak 6–10 min.

Where can I interchange from Green Line to other lines?

Rashtreeya Vidyalaya Road (Yellow Line); Nadaprabhu Kempegowda Station, Majestic (Green Line) (Purple Line (Whitefield (Kadugodi) → Challaghatta), Purple Line)

Who operates Green Line?

Bangalore Metro Rail Corporation (BMRCL). Rolling stock: BEML · 6-car. Design speed: 80 km/h.

Source: Bangalore Metro Rail Corporation, OpenStreetMap, Official publications · Last updated: Aug 2026