Blue Line
Phase 2A points are snapped to mapped OpenStreetMap Outer Ring Road geometry; Phase 2B points follow the airport-road alignment. These are corridor anchors, not officially published future station-center coordinates. Station names and openings should be checked against the latest BMRCL/DPR release.
Central Silk Board ⇄To
KIAL Terminals
Pan, zoom, click a colored line or select a station · Map data © OpenStreetMap contributors
Connecting lines & interchanges
Explore other lines
About Blue Line
Frequently asked questions
Which stations are on Blue Line in Bengaluru Metro?
32 stations from Central Silk Board to KIAL Terminals: Central Silk Board, HSR Layout, Agara, Ibbaluru, Bellanduru, Embassy TechVillage / Kadubeesanahalli, Kodibeesanahalli, Marathahalli, ISRO, Doddanekundi, DRDO Sports Complex, Sarasvathi Nagara, Krishnarajapura (KR Puram), Kasturinagara, Horamavu, HRBR Layout, Kalyana Nagara, HBR Layout, Nagawara, Veerannapalya, Kempapura, Hebbala, Kodigehalli, Jakkuru Cross, Jakkuru Plantation, Yelahanka, Bagaluru Cross, Bettahalasuru, Chikkajala, Doddajala, Airport City, KIAL Terminals.
What are the first and last train timings for Blue Line?
First train — — last train —. Not in service; Phase 2A target opening is late 2026 and Phase 2B target opening is mid to late 2027. Timings will be published by BMRCL before opening. Timings can vary by station and direction; confirm with Bangalore Metro Rail Corporation.
How long does Blue Line take end to end?
About 106–110 min over 52.6 km. Peak frequency 6–10 min, off-peak 10–15 min.
Where can I interchange from Blue Line to other lines?
Central Silk Board (Yellow Line); Krishnarajapura (KR Puram) (Purple Line (Whitefield (Kadugodi) → Challaghatta), Purple Line)
Who operates Blue Line?
Bangalore Metro Rail Corporation (BMRCL). Rolling stock: BEML · 6-car. Design speed: 80 km/h.
Source: Bangalore Metro Rail Corporation, OpenStreetMap, Official publications · Last updated: Aug 2026