OPERATIONAL · KOLKATA METRO

Purple Line

South-west corridor reference.

From
Joka
⇄To
Esplanade
▭7.8 kmLength
◉7Stations
◷14–18 minTravel time
▦— – —Service hours
◎ Overview◉ Stations⬡ Connections◷ Timings↗ Updates
MapSatellite
⛶ Full screen
Normal map · OpenStreetMap 1 metro lines · 1 networks · Updated Aug 2026
Loading OpenStreetMap…
Metro Station

Pan, zoom, click a colored line or select a station · Map data © OpenStreetMap contributors

Purple Line (Purple Line) Station
Stations (7)View all stops
01MajerhatOrigin
02Taratala
03Behala Bazar
04Behala Chowrasta
05Sakher bazar
06Thakurpukur
07JokaTerminus

Explore other lines

About Purple Line

▦OpenedPhased opening
◉OperatorMetro RailwayMetro Railway, Kolkata
▭Rolling stockICF / BEMLStandard trains
◷Design speed80 km/h

Frequently asked questions

Which stations are on Purple Line in Kolkata Metro?

7 stations from Joka to Esplanade: Majerhat, Taratala, Behala Bazar, Behala Chowrasta, Sakher bazar, Thakurpukur, Joka.

What are the first and last train timings for Purple Line?

First train — — last train —. Not in service; timing will be published before opening. Timings can vary by station and direction; confirm with Metro Railway, Kolkata.

How long does Purple Line take end to end?

About 14–18 min over 7.8 km. Peak frequency —, off-peak —.

Where can I interchange from Purple Line to other lines?

This line has no same-city interchange within the mapped network. Check the full network page for connections via shared stations.

Who operates Purple Line?

Metro Railway, Kolkata (Metro Railway). Rolling stock: ICF / BEML. Design speed: 80 km/h.

Source: Metro Railway, Kolkata, OpenStreetMap, Official publications · Last updated: Aug 2026